Family of Christ Lutheran Church, Monument, CO. Engineer of record for 9,000 sqft auditorium addition to existing church. |
Southeast Christian Church Youth Ministry (Phase III), Parker CO. Engineer of record for electrical design of 2,000 seat Worship Center, an 8,000 sqft, 2-story lobby, and a 400 seat café/bistro. |
High Desert Church Master Plan and Children’s Ministry Center, Victorville CA. Engineer of record for electrical design of 63,000 sqft children’s education building and 387,000 sqft 56-acre master plan. |
Hope Chapel, Kihei, Hawaii. Engineer of record for electrical design of 103,000 sqft of facilities including 800 seat multi-purpose auditorium, nursery, classrooms, administrative offices, bookstore, café, and two apartment-style living units to house the church’s interns. |
El Tesoro De Los Angeles Retreat and Conference Center, Woodland Park, CO. Engineer for power & lighting design of 37,000 sqft religious retreat and conference center. | McLean Bible Church, Vienna, VA –New 2,400-seat auditorium and a 20,000-ft2 lobby/fellowship atrium, plus remodel of existing building for classrooms and offices. The project totals 279,000-ft2 at a cost of $30 million. Electrical systems design included 6000A switchboard, motor control center, standby engine generator, fire alarm system, PA system, lighting, convenience receptacles, and miscellaneous. |
The Ridge Church, Broomfield, CO. Engineer of record for 10,500 sqft church. | Denton 1st Church of Nazarene, Denton, TX. Engineer of record for power & lighting of 17,000 sqft church. |
Tricity Baptist Church, Westminster CO. Engineer of record for power & lighting design of 10,000 sqft auditorium addition. | Good Shepherd United Methodist Church Tenant Improvement, Thorton CO. Engineer of record for electrical design. |
|
Grace Community Assembly of God, Flower Mound, Texas. Engineer of record for electrical design of 15,500 sqft church addition. |